CONTINUOUS IMPROVEMENT · DATA · ENGINEERING

Continuous improvement supported by plant data.

Connect losses, interventions and results using comparable production, process, quality and energy data.

KERN IoP helps establish a baseline, record what changed, track behaviour after the intervention and retain the context needed to determine whether the result persists when the shift, product, mould, material or operating conditions change.

KERN IoP MONITOR showing OEE, availability, performance, quality and downtime analysis in an industrial plant.
Interface shown in Spanish.

ENGINEERING PRINCIPLE

A substantiated improvement needs a baseline, an intervention and a comparable verification.

An isolated trial may deliver a promising result. Continuous improvement turns that result into reproducible knowledge by retaining the conditions surrounding the trial and observing what happens when normal production resumes.

Baseline

How the process currently operates, with enough context to identify equivalent products, states, shifts and conditions.

Documented intervention

What changed, when, on which asset or recipe, and what result was expected.

Follow-up

What happened afterwards, how much the result varied and whether the achieved condition is sustained in actual production.

KAIZEN · IMPROVEMENT CYCLE

Data should accompany the entire improvement cycle.

01 · OBSERVE

Isolate the loss

Downtime, cycle time, rejects, consumption, process variation or instability.

02 · UNDERSTAND

Formulate a hypothesis

Relate the loss to machine, process, peripheral, material or method conditions.

03 · INTERVENE

Change a condition

Document the adjustment, date and scope so the change can be related to the results.

04 · COMPARE

Measure the effect

Use comparable periods and conditions, accounting for product mix and shifts that could distort the comparison.

05 · STABILISE

Control variation

Observe dispersion, trends and condition changes to establish whether performance remains within the expected range.

06 · SUSTAIN

Continue monitoring after the trial

Verify that the condition is sustained and detect when a new cause starts to degrade the result.

Improvement measures become more targeted when losses are separated by mechanism.

An aggregate indicator helps reveal a performance gap. To choose an effective intervention, break the indicator down and examine which component is changing.

Availability and productivity

Downtime, microstops, speed, cycle time, counts and causes. OEE can summarise losses; meaningful analysis requires its components to remain available.

Explore OEE according to ISO 22400 →

Quality and process

Rejects, weight, dimensions, inspections and critical process variables can be related to investigate stability and the causes of variation.

Explore quality and process data →

Energy and resources

kWh, power, specific consumption and other utilities, where instrumented, help assess changes under comparable conditions.

Explore energy measurement →

MEANINGFUL COMPARISONS

Operational context helps attribute improvements to the right cause.

Comparing averages from two weeks may be insufficient if the product, mould, material, shift or mix of operating states changed. KERN IoP retains variables and context to support more meaningful comparisons.

Equivalent conditions

Filter by machine, product, mould, material, recipe, shift or state when these variables affect the result.

Sufficient observation period

Extend monitoring beyond the initial trial to observe variation between cycles, shifts and normal production events.

Consistent calculation rules

Maintain the same definitions of states, losses, units and denominators so that before-and-after results remain comparable.

An improvement may be technically valid even if the overall average does not change immediately; the reverse is also possible. Retaining sufficient detail makes it possible to revisit the cause and interpret the aggregate KPI accurately.

KERN IoP integration with quality measurement and data acquisition at an injection moulding machine.

INVESTIGATING THE CAUSE BEHIND THE KPI

Engineering analysis can investigate the mechanism behind the symptom.

When a loss depends on several variables, PM Tec Engineering can complement KERN IoP data with root-cause analysis, design of experiments, simulation and physical or hybrid modelling.

  • Identify variables that change before the loss appears.
  • Design trials that separate the effects of correlated variables.
  • Relate process measurements to quality, energy or productivity.
  • Build models to estimate states or compare scenarios.
  • Define indicators that track the underlying mechanism as well as the aggregate result.

This use of information is directly linked to Industry 4.0 as support for the people working in production: making evidence visible so operators, technicians and engineers can diagnose problems and sustain improvements.

Follow-up helps turn a one-off improvement into an established operating condition.

After an intervention, KERN IoP can retain historical data and context to assess stability, detect regressions and compare performance with the defined baseline.

Technical guide

How to establish a baseline, record the intervention and verify that an improvement is sustained in production.

Read the verification guide →

KERN IoP | MONITOR

Access historical data, states, variables and indicators from the sources integrated into the installation.

Explore MONITOR →

Implementation

If the variable is not yet available, we can assess how to acquire it, add context and validate it on the plant floor.

Explore industrial implementation →

CONTINUOUS IMPROVEMENT · FREQUENTLY ASKED QUESTIONS

Useful data for determining whether an improvement works and lasts.

What should be measured before making an improvement?
Measure the variable that represents the loss and retain the conditions that can change its interpretation. Depending on the case, this may include times, states, cycle time, rejects, energy, pressure, temperature, flow or other process variables, together with product, mould, material, order or shift information.
How long should monitoring continue?
The duration depends on the process. It must be sufficient to observe relevant variation and normal conditions that can affect the result: different shifts, batches, products, start-ups, mould changes or other events relevant to the application.
Is OEE sufficient for managing continuous improvement?
Correctly defined OEE is useful for summarising availability, performance and quality losses. To address a specific cause, retain states, times, downtime reasons, the technical reference and other variables that help isolate the mechanism behind the indicator.
How does KERN IoP support comparisons of equivalent conditions?
The platform can retain asset, product, order, mould, material, state or shift context when those data are included in the installation. This enables historical data to be filtered and comparisons to be made under technically equivalent conditions.
Does KERN IoP guarantee savings after an improvement is implemented?
KERN IoP provides measurements, context and historical data to quantify results. The economic effect of an intervention must be established using a baseline and a verification method agreed for the specific case.