KERN IoP | ENERGY: CELL

Understand your injection-moulding cell’s energy consumption, equipment by equipment.

Measure the injection-moulding machine and auxiliary equipment simultaneously. Identify major loads, examine energy demand during idle periods and use the measurements to investigate operational improvements.

Plastics injection moulding cell with machine controls and KERN IoP SMARTPRO installed in an industrial plant.

Dryer

12.4 kW

Power · example

Example

Machine

28.6 kW

Power · example

Example

Mould temp.

8.7 kW

Power · example

Example

Auxiliaries

4.1 kW

Power · example

Example

Electrical power demand of the cell

53.8 kW
Power

Injection-moulding machine · 53%

Dryer · 23%

Mould temperature controller · 16%

Other auxiliary equipment · 8%

Accumulated energy (shift)352.1 kWh

Specific energy consumption0.42 kWh/kg

Illustrative visualisation of an injection-moulding cell. The power values, trends and indicators are hypothetical examples, not measurements from an actual plant.

UNDERSTAND CELL ENERGY CONSUMPTION

Where is electricity consumed during production?

The injection-moulding machine operates alongside dryers, mould temperature controllers, robots and cooling systems. Their energy demand varies with the product, cycle time, processing parameters and operating state.

ENERGY: CELL measures several single-phase or three-phase electrical feeds so that each instrumented circuit provides separately identifiable power and energy data. Measurement points are selected according to the installation’s electrical distribution.

KERN IoP | ENERGY CELL / MACHINE AND AUXILIARIES

Understand each component’s contribution to energy consumption.

Simultaneous measurement distinguishes the injection-moulding machine’s consumption from that of connected auxiliary equipment. This allows each load’s operating behaviour to be examined and helps prioritise further investigation.

Measurement flow
  1. Circuit-level measurementThe injection moulding machine and selected auxiliaries are measured separately.
  2. Front view of the KERN IoP | SMARTHUB showing the display, terminal blocks, USB and Ethernet ports.KERN IoP | SMARTHUBCollects meter readings and any cycle or machine-state signals available through the installation.
  3. Review in MONITORCompare consumption by equipment and relate it to operating conditions.

01 / MACHINE

Power and energy of the injection-moulding machine

Examine how machine power and energy consumption change over time, identify peak-demand periods and compare operating conditions.

02 / AUXILIARY EQUIPMENT

Power and energy by auxiliary unit

Distinguish the consumption of dryers, mould temperature controllers, robots and other separately supplied auxiliaries according to the selected circuits.

The technical assessment identifies electrical feeds, associated equipment and suitable measurement points for the cell.

Request cell measurement →

APPLICATIONS

Information supporting better plant operation.

01

Active power meter

Consumption by equipment

Identify the loads with the greatest electricity demand and examine how their contribution changes across operating periods.


02

Equipment on standby

Start-up and idle periods

Quantify energy used during heating, preparation, product changes and waiting periods. With integrated production signals, consumption can be associated with operating states.


03

Power curves for comparing periods

Verification of improvements

Establish a baseline and compare records before and after process adjustments, changes to auxiliary equipment or maintenance interventions under documented conditions.

PLANT APPLICATIONS

Four analyses to support technical decisions.

Energy records become valuable when connected with practical production, maintenance and cost-management questions.

01 / APPLICATION

Product energy cost

Combining measured kWh with part counts or kilograms produced enables calculation of kWh/part and kWh/kg and an estimate of manufacturing electricity costs using the applicable tariff.

02 / APPLICATION

Energy consumption during non-productive periods

Compare energy consumed during production, preparation, heating and waiting, relating intervals to available operating states.

03 / APPLICATION

Differences between machines and products

Compare equipment or production campaigns with documented material, products and conditions to investigate differences in specific energy consumption.

04 / APPLICATION

Results of an intervention

Measure before and after process adjustments, insulation improvements, auxiliary-equipment changes or operating changes, using the records for verification.

ILLUSTRATIVE EXAMPLE · ENERGY: CELL

What could faster preparation of 20 injection-moulding cells mean?

Consider a plant with 20 injection-moulding machines performing one mould change per machine per day. By examining preparation times and the energy consumption of machines and auxiliaries, engineering and production teams identify opportunities to coordinate tasks, standardise mould changes and optimise start-up and preheating sequences.

BEFORE AND AFTER

ActivityBeforeAfter
Mould change2 h30 min
Start-up and preheating1 h30 min
Total per change3 h1 h

Two fewer preparation hours per change. The activities are assumed to be consecutive, with 22 operating days per month.

WHICH EQUIPMENT IS MEASURED?

50 kW average power per cell

Hypothetical allocation of average power during preparation periods:

  • Moulding machine: heating and internal auxiliaries18 kW
  • Material dryer12 kW
  • Mould temperature controller8 kW
  • Local cooling equipment7 kW
  • Mould preheater5 kW

These are illustrative averages. Actual power profiles vary during heating, mould changes and idle periods. Simultaneous measurement can determine the consumption of instrumented circuits.

CUMULATIVE IMPACT ACROSS 20 CELLS · 22 DAYS/MONTH

Mould changes per month

440

Recovered machine-hours

880 h

Avoided preparation energy

44,000 kWh

Illustrative energy value at USD 0.1900/kWh

USD 8,360/month

Calculation: 20 machines × 1 change/day × 22 days × 2 hours saved × 50 kW = 44,000 kWh of avoided preparation energy. At USD 0.1900/kWh, this corresponds to USD 8,360 per month.

How can ENERGY: CELL help? By measuring the moulding machine, dryers, temperature-control equipment and other selected loads separately, plant teams can identify preparation consumption, establish a baseline and verify operational improvements.

Example assumptions: This hypothetical scenario assumes constant average power of 50 kW per cell during preparation both before and after the improvement. The figure represents energy associated with eliminated preparation time; net bill savings depend on measured power profiles, additional consumption during production in the recovered hours and tariff structure. Shorter preparation times require operational changes and process validation.

DATA FOR ENGINEERING AND PRODUCTION

Indicators for production, engineering and energy management.

Begin by measuring power and energy by electrical feed. With production, material, product and operating-state data, extend the analysis to specific consumption, product-related behaviour and economic evaluation.

Independent electrical feeds within a cell

Consumption breakdown

Review power (kW) and energy (kWh) for each instrumented feeder and its contribution to cell consumption.

Idle periods

Loads that continue consuming energy

Investigate how much energy dryers, heaters and other auxiliaries consume during preparation, stoppages and waiting.

Specific energy consumption

Specific energy consumption

Relate measured energy to kilograms processed or parts produced to calculate kWh/kg and kWh/part. Production records determine which consumption and time intervals are included.

Process analysis

Comparable conditions

Compare products, moulds, materials and operating conditions where these are recorded. Examine energy differences alongside changes in productivity.

Request a measurement proposal →

ENERGY: CELL · FURTHER READING

Investigate energy-efficiency opportunities in more depth.

Explore how to examine consumption during idle periods, prioritise energy losses and use electrical measurements for plant management.

How much energy is consumed outside production?

Interpreting consumption during idle periods and heating.

Which energy costs deserve management attention?

Identifying losses and estimating their financial impact from operating data.

What should the energy manager review?

Explore resources by area of responsibility.

CONFIGURATION AND EXPANSION

Start with measurements most relevant to your operation.

Electrical instrumentation by equipment

Work with our team to define which electrical feeds to instrument, the data-acquisition configuration and the visualisations needed for initial cell analysis.

Integration with production data

Expand the project with part counts, kilograms, operating states or shared utility data when product-related energy indicators or integration with other KERN IoP applications are required.

ENGINEERING METHODOLOGY

Energy measurement with defined technical references.

The recommendations EUROMAP 60.1 and EUROMAP 60.2 distinguish energy assessment of the injection-moulding machine from determining consumption associated with a specific product and process.

ENERGY: CELL documents the instrumented circuits and associated equipment. When product-related indicators are required, production records, system boundaries and comparison conditions are defined. Allocation of centralised utilities, such as shared cooling, depends on the electrical configuration and the study objective.

These recommendations serve as methodological references. Conformity with a specific test procedure requires separate verification of instrumentation, measurement conditions and applicable documentation.

Explore KERN IoP | ENERGY →

CONNECTING EXISTING EQUIPMENT

Using data from moulding machines and auxiliaries

Cell-level energy monitoring can serve as an initial step in instrumenting existing equipment. Review how to combine machine signals, additional sensors, quality data and production context.

Digitalise existing injection-moulding machines →    SME digitalisation study →

LET US DEFINE YOUR CONFIGURATION

A system suited to your installation.

Tell us about your injection-moulding machine, associated auxiliaries and technical questions. We will review your electrical distribution and recommend suitable measurement points. Instrumentation can begin with one cell and expand later.

KERN IoP | SMARTPRO beside the control panel of an injection moulding machine.
KERN IoP | SMARTPRO integrated with an injection-moulding machine.

Discuss the energy demand of your injection-moulding cell.

Describe the equipment in your cell and your measurement objectives. We will prepare a technical proposal to analyse the consumption of the machine and its auxiliaries.


PM Tec Engineering, through its Industry 4.0 division, KERN IoP.
Cota, Cundinamarca · Colombia.
© 2026 PM Tec Servicios de Ingeniería SAS · Website updated in 2026.

Privacy policy