IMPLEMENTATION ENGINEERING · KERN IoP
Industrial implementation and commissioning.
We integrate sensors, machine signals, meters, production data and operational context to deliver reliable information through KERN IoP from the moment the system is commissioned.
We begin by defining what needs to be measured, where each data point will come from and how it will be used. We then engineer the integration, install the system, verify the quality of the records and document the scope delivered.

BEFORE INSTALLATION
Implementation starts with the information your plant needs.
Before specifying hardware or wiring, we review the use case, available data sources and required context. This helps us focus on useful signals and establish how the installation will be tested and accepted.

Variables and data sources
We identify the variable needed to answer each question: cycle time, machine state, pressure, temperature, energy, flow, production, quality or another relevant measure. We then establish a technically viable data source.

Interfaces and architecture
We assess the available signals, PLCs, meters, networks and interfaces. The architecture depends on the machine and the project: OPC UA/EUROMAP, Modbus, industrial I/O, sensors or a combination of these.

Production context
We agree which information should accompany each signal: asset, product reference, order, mould, material, shift, batch, operating state or quality result, as applicable.

Acceptance criteria
We define what must be verified before handover: identification, units, timestamps, operating states, ranges, data continuity, calculations and agreed visualisations.
WORKING METHOD
Six stages to make production data ready for use.
01 · SCOPE
Question and use case
We define the decision or indicator the system must support and identify the equipment within scope.
02 · SITE ASSESSMENT
Machines, signals and site
We review equipment, electrical panels, PLCs, networks, power supplies, interfaces, mounting conditions and production-data sources.
03 · ENGINEERING
Integration architecture
We select an appropriate source for each variable and define acquisition, communications, operational context and data structure.
04 · INSTALLATION
Installation and instrumentation
We install the specified components and coordinate the work with production, maintenance, automation and IT teams.
05 · VALIDATION
Commissioning
We compare measurements with actual plant behaviour, verify timestamps, states, units and calculations, and document the results.
06 · HANDOVER
Operation and support
We show the responsible teams how to access the information, maintain consistent records and extend the installation when needed.

REAL PLANTS · EQUIPMENT OF DIFFERENT GENERATIONS
The integration strategy depends on the machine and the systems already in place.
An installation may involve a modern injection-moulding machine with OPC UA/EUROMAP, an older machine with PLC and discrete signals, energy meters or additional sensors. It may also operate alongside existing MES, ERP, SCADA or historian systems.
- Modern machines: we make use of available structured data and add the production context required for analysis.
- Machines without a data interface: we assess PLCs, digital and analogue I/O, meters and external sensors to obtain the information needed.
- Plants with existing systems: we design data exchange around the available interfaces and build on the functions already provided by MES, ERP or other platforms.
- Complete manufacturing cells: depending on the use case, an installation may cover the machine, auxiliaries, energy, ambient conditions and quality.
VALIDATION AND HANDOVER
Before handover, we verify that the data reflect conditions on the plant floor.
A graph appearing on a screen is only the beginning of commissioning. Data must be identifiable, consistent and sufficiently reliable for their intended use.
- Equipment and variables correctly identified.
- Units, scaling and ranges consistent with the physical source.
- Consistent timestamps and event sequence.
- Operating states checked against the machine.
- Continuous data acquisition over the test period.
- Product, order or batch context where included in scope.
- Indicators and calculations verified against their input data.
- Connections, variables and test results documented.

Support after commissioning
We can support data reviews, configuration adjustments, new indicators and team training so that the information continues to be used consistently.
Planning an installation?
Tell us which machines and variables are involved and what the project needs to achieve. Together we can review the information already available and identify any additional instrumentation required.
IMPLEMENTATION · FREQUENTLY ASKED QUESTIONS
What to define before introducing plant data into daily operations.
What information is needed before installing KERN IoP?
Can KERN IoP be installed on an older machine without OPC UA?
How do you verify the accuracy of acquired data?
Can KERN IoP work alongside existing MES, ERP, SCADA or historian systems?
Must the entire plant be instrumented from the outset?
What happens after commissioning?
Engineering
PM Tec Engineering, through its Industry 4.0 division, KERN IoP.
Cota, Cundinamarca · Colombia.
© 2026 PM Tec Servicios de Ingeniería SAS · Website updated in 2026.

You must be logged in to post a comment.