PRODUCTION AND SUPERVISION
Review cycles and stoppages during the shift.
Review machine records and document stoppage reasons where they occur, using a recording procedure suited to your operation.
Reconstructing events at the end of a shift often means losing detail. The duration of a stoppage, its cause and product changeovers may be documented by different people in different records.
PRODUCTION / SHIFT SEQUENCE
What happens between two parts also matters.
Combine recorded cycles and available machine states with production-team notes to examine output rate, stoppages and product changeovers.

CYCLES
Counts and durations where a reliable cycle signal is available.
STOPPAGES
Detected intervals and causes recorded by personnel or the system.
END-OF-SHIFT REVIEW
Output, operating time and losses based on consistent rules across machines.
VISIBILITY ON THE PLANT FLOOR
Real-time data to support decisions during the shift.
Displaying machine status during production makes it possible to identify stoppages or falling output rates before a shift ends. Instead of serving only as a historical record, the information becomes an operational reference for supervisors, production and maintenance teams.
Where production orders include a target quantity and product reference, progress monitoring can also help estimate when the run will finish and when the next mould, material or product change should be prepared.

01 · STATUS
Identify stoppages and reduced output rates
Seeing which machines are producing, stopped or running below the expected rate enables teams to respond while a loss is still occurring.
02 · PROGRESS
Prepare the next changeover
With target quantity, actual counts and product reference available, order progress can help coordinate moulds, materials, personnel and changeover activities in advance.
03 · CAUSES
Focus improvement on the largest time losses
Consistent stoppage classification reveals which causes account for the most lost time or recur most frequently, helping prioritize improvement work.
04 · CONTEXT
Connect machine signals with actual events
Automatically collected data become more informative when complemented by product references, stoppage causes and operator notes needed to interpret the shift.
PRODUCTION · FURTHER ANALYSIS
Is the shift losing time to stoppages or longer cycles?
Production teams need to know how much time the machine was stopped and how much time it operated below its planned rate. Combining cycle signals, stoppage classifications and product identification allows these losses to be examined separately.

Which records are needed to distinguish them?
Identify planned time, actual cycles and a valid ideal cycle time for the product. Operator records entered through SMARTPRO help explain why stoppages occurred.
Other questions: Quantify lost capacity · Records at the machine · Include quality data during the shift
This reflects an approach to Industry 4.0 that strengthens operators and production managers: data should support decisions during the shift and subsequent verification of improvements.
A PLANT-FLOOR EXAMPLE
Before drawing conclusions.
A cycle signal reveals machine activity and output rate. Calculating complete OEE additionally requires scheduled time, a valid ideal cycle time and good-part quantities. Dashboards should display only indicators supported by the available data.
RELATED CONTENT
KERN MONITOR
Access to historical records and variables.
OEE calculation
Data required for each OEE component.
TO INVESTIGATE FURTHER
Investigate stoppages using operating records
Relate machine states, production logs and maintenance interventions to understand the effect of each stoppage.
APPLICATION ASSESSMENT
Request a production-monitoring demonstration
The demonstration should cover an operator task and a supervisor review: recording a stoppage, changing a product reference and examining the period. Available features are confirmed for the proposed configuration.
Describe your needs using the information available. You do not need to attach confidential data.
Applications
Engineering
PM Tec Engineering, through its Industry 4.0 division, KERN IoP.
Cota, Cundinamarca · Colombia.

You must be logged in to post a comment.