KERN IoP | ENERGY · ENERGY MEASUREMENT FOR INJECTION MOULDING

See where your injection moulding cell consumes energy.

Measure the injection moulding machine and your selected peripherals simultaneously. Separate their consumption, establish baselines and understand what happens within the cell before deciding where to intervene.

One machine or a complete cell · Three-phase and single-phase supplies · Expandable configuration

Conceptual view of an injection moulding cell connected to KERN IoP | Energy

Machine and peripheral measurement within a common measurement boundary.

◉

Simultaneous measurement

Injection moulding machine and peripherals over the same operating periods.

↯

Three-phase and single-phase

Supplies with different electrical configurations, according to the installation.

↗

Historical data and baselines

Record trends to compare periods and conditions.

◎

Process context

Integrate cycle or production signals where required.

CELL ENERGY VISIBILITY

Locate the loads behind the plant’s total energy bill.

In an injection moulding cell, peripherals may operate under different conditions from the machine. Separating the measured loads identifies which equipment uses energy and when.

01 /

Combined consumption

Diagram of electrical loads combined into total consumption

A combined total leaves the contribution of each item of equipment unresolved.

02 /

Loads outside production

Diagram of electrical loads that may remain active outside production

Some auxiliaries may continue drawing energy while idle or during downtime.

03 /

Decisions needing a baseline

Diagram representing energy analysis without a comparison baseline

A baseline is needed to verify the result of an intervention.

ENGINEERING INTERPRETATION OF MEASUREMENTS

Comparison requires measuring each supply and identifying the operating conditions during the analysed period.

Infographic showing energy measurement and improvement in industrial processes

01

Measure

Capture power and energy from each selected supply during operation.

02

Add context

Relate consumption to machine states, cycles and production where those data are available.

03

Compare

Establish baselines and compare technically equivalent operating conditions.

KERN IoP | ENERGY CONFIGURATIONS

Select the measurement scope that suits your installation.

A configuration for one machine or for the complete cell. Measurement points are defined by the electrical infrastructure and the question you need to answer.

DEDICATED ENERGY MEASUREMENT

KERN IoP | Energy: Machine

Conceptual diagram of electrical measurement on an injection moulding machine with Energy Machine
Conceptual representation of machine energy recording and analysis

Characterise one machine, supply or main load within a clearly defined measurement boundary.

✓ Power and energy over time

✓ Historical recording

✓ Comparisons within the same measurement boundary

✓ Ready to extend the measurement scope

MACHINE AND PERIPHERALS IN PARALLEL

KERN IoP | Energy: Cell

Conceptual diagram of simultaneous machine and peripheral monitoring with Energy Cell
Conceptual representation of simultaneous measurement in an injection moulding cell

Separate the consumption of the injection moulding machine and selected peripherals while also viewing the cell’s combined behaviour.

✓ Several loads measured in parallel

✓ Three-phase and single-phase supplies

✓ Energy breakdown by equipment

✓ Expansion to include production context

KERN IoP | ENERGY displaying energy measurements.

INFORMATION FOR DECISIONS

See how each item’s energy consumption behaves.

Instantaneous power, accumulated energy, equipment breakdown and historical data to interpret consumption over time.

Conceptual image of the KERN IoP power and energy monitoring dashboard

Example of an energy consumption visualisation.

Instantaneous power

kW

Accumulated energy

kWh

Equipment breakdown

%

Baseline

Reference

History

Time

Comparison

Before / after

Relate energy to production when reliable production data are available.

With a defined measurement boundary and verifiable production data, the system can calculate normalised indicators. These indicators require both electrical measurements and the relevant production data.

Energy per cycle

Pictogram for kWh per injection moulding cycle

kWh/cycle

Energy per part

Pictogram for kWh per part produced

kWh/part

Energy per unit mass

Pictogram for kWh per kilogram of material

kWh/kg

Energy by product

Pictogram of electrical energy by product reference

Comparison

PLANT APPLICATIONS

Questions worth answering with data.

Which equipment consumes the most?

Identify the distribution across measured loads.

What continues consuming energy during downtime?

Analyse defined idle periods.

Did consumption change after the intervention?

Compare against a baseline under equivalent conditions.

Which condition demands more power?

Compare power and its behaviour over time.

How is energy distributed?

Observe the machine and selected auxiliaries.

What should be measured first?

Define the scope before installing sensors.

DEFINING THE SCOPE

Before selecting your configuration

Must the entire cell be instrumented from the start?

We can define an initial measurement scope and extend it to other loads later.

Can consumption per part or kilogram be compared?

Yes, when reliable production data are integrated and the measurement period and boundary are correctly defined.

Does the equipment guarantee a specific saving?

Energy provides information for identifying opportunities and verifying results. Any saving must be assessed against a baseline under comparable conditions.

LET’S DISCUSS YOUR APPLICATION

Tell us what you need to measure.

Describe your machine or cell, the auxiliary equipment and what you need to understand about consumption. We will review the information and propose an initial measurement scope.

PM Tec Engineering, through its Industry 4.0 division, KERN IoP.

Request your recommended configuration

Enter your application details. You can also use the direct email address below.

Before submitting, read the terms of use and privacy policy published by PM Tec Engineering.

← Volver

Gracias por tu respuesta. ✨

Privacy and personal data processing policy

You can also write to info@pm-tec.co.


PM Tec Engineering, through its Industry 4.0 division, KERN IoP.
Cota, Cundinamarca · Colombia.

Privacy policy