Define the problem and the measurement
An injection-moulding plant may need to reduce downtime, understand cycle-time variation, investigate rejects or separate the energy used by the machine and its auxiliaries. Digitalisation priorities should follow the operating problem and the indicator used to assess the result.
The initial assessment covers machines, moulds, materials, available signals and data infrastructure. These findings define the instrumentation scope, acquisition frequency, production context and project responsibilities.
Fit data entry into the operator’s work
Manual records need clear rules: what information is required, who enters it and when. A downtime cause or reject count becomes useful when personnel can record it during operation and understand how it will be used.
The interface should show the information needed for the task. Training covers both operation of the tool and interpretation of states, times, quantities and downtime reasons. Recording errors and practical difficulties should be reviewed with the plant team as the system is used.
Keep the process context with the data
Analysis requires a link between each measurement and the relevant equipment, product, mould, material, order and period, according to the installation scope. This context supports comparisons under technically equivalent conditions and reconstruction of events preceding a deviation.
Connections to MES, ERP and other applications depend on the information required and the interfaces available. OPC UA and the relevant EUROMAP specifications can support integration where the equipment and its licences provide those capabilities.
Assess further investment
Evidence from operation helps assess additional measurements, automation or models. Computer vision, digital twins and advanced control should be evaluated against the problem, the information available and the validation requirements.
KERN IoP combines data acquisition, software and engineering work to define this scope. An intervention is assessed by comparing a baseline with a subsequent period under comparable conditions, using technical and economic criteria agreed for the project.

Leave a Reply